Coordinated Multi-Factory Manufacturing
Centralized production coordination across our factory network delivers a 15-18 day常规 delivery cycle, 50-piece MOQ flexibility and multi-SKU mixed batches — with sampling in just 3-5 days.

Fast Sampling, Predictable Delivery
A dedicated sampling team turns prototypes around in 3-5 days so you can validate materials, dimensions and construction early — then locks the BOM and spec sheet to keep bulk production consistent.
Conventional orders move through a 15-18 day cycle from PO confirmation to ex-works, with milestone tracking at fabric sourcing, cutting, sewing, finishing and packing.
The 15-18 Day Production Cycle
From PO confirmation to ex-works, every order moves through tracked milestones.
- Day 1-3
Sampling & Validation
A dedicated sampling team turns prototypes around in 3-5 days to validate materials, dimensions and construction early.
- Day 3-5
BOM & Spec Lock
Lock the bill of materials and spec sheet to keep bulk production consistent with the approved sample.
- Day 5-9
Fabric Sourcing & Cutting
Plan Your Production with Us
Tell us your timeline, MOQ and SKU mix — we will build a manufacturing plan that fits.
